Reliability & Backups
21 achievements

Photo: fotoblend / Pixabay 
Photo: Lakeblog / Pixabay
-
Ran 100 PostgreSQL, MS SQL, BigQuery warehouses
Architected, created, and managed 100 PostgreSQL, MS SQL, and Google BigQuery data warehouse databases with primarily GIS and time‑series data, optimizing performance and scalability.
-
Automated GIS SaaS deployment with GitHub Actions
Automated GIS SaaS application deployment, data processing, and reporting system using GitHub Actions CI/CD, Python, Bash, and SQL.
-
Automated delivery of 20 GIS data pipelines
Automated delivery of 20 GIS data pipelines and app data ETL processes, streamlining infrastructure automation and reporting.
-
Led a GIS map application to 10x revenue growth
Led the software development of a GIS map application, driving revenue growth by 10x and positioning the product as a primary data asset.
-
Led 30+ GIS projects from build to support
Led the development, deployment, and support of over 30 GIS projects, demonstrating expertise in PostgreSQL, Bash, Python, JavaScript, GDAL, ArcGIS, PostGIS, and Mapbox technologies.
-
Administered 40 websites on Apache and Nginx
Administered 40 websites on Ubuntu Linux hosting servers with Apache and Nginx, ensuring high availability and performance.
-
A mapping product, carried end to end
Architected, developed, implemented, supported infrastructure, data processing, and the map application for 2 years non‑stop without any weekends, holidays, or vacations, 10–14 hours a day.
-
Generated the API contract from the database out
Generated the API contract outward from the database — OpenAPI, a 44,076‑line typed TypeScript client, 61 mock handlers and the limits the UI enforces — with a guard at every hop that fails on drift.
-
Built email with failover and delivery logging
Built email as a platform capability — three providers with failover, delivery webhooks, send and delivery logging, templating and campaigns — behind a startup check that will not boot without one.
-
Delivered full Progressive Web App support
Delivered full Progressive Web App support — installable and offline‑capable — with Workbox runtime caching via next‑pwa.
-
Built infrastructure that still runs years later
Planned and implemented new infrastructure functionality for internal and external systems, building solutions durable enough to still run years later with minimal change.
-
Built a test suite across Go, SQL and browser
Built a layered automated test suite — 981 Go tests, 543 frontend and browser specs, 494 SQL behavioural tests — with mutation testing, property‑based tests and an accessibility gate.
-
Moved slow work onto a River job queue
Moved slow work off the request path onto a River job queue — 15 worker modules, 8 scheduled tasks and 20 pg_cron jobs — so a request returns while the work behind it carries on.
-
Built first‑party error monitoring and tracing
Built first‑party error monitoring and OpenTelemetry tracing rather than buying them — payload sanitising, spike and regression detection, symbolication and a synthetic heartbeat — behind 11 operator views.
-
Built fail‑closed rate limiting and anti‑abuse
Built fail‑closed abuse controls — 22 Redis‑backed rate limiters, Cloudflare Turnstile, request idempotency and an origin lock — so the platform sheds bots and floods instead of trusting its callers.
-
A whole company on one small server
Ran the whole company on one 512 MB single‑core host — a git forge, a web server serving seven domains, Tor, two alternate‑protocol servers, backups and intrusion banning — by treating 464 MB of usable memory as the binding architectural constraint.
-
Held the generator to 981 tests and 92% coverage
Held the generator to 981 test cases at a 92% branch‑coverage floor with warnings treated as failures, and asserted idempotence by running the whole build pipeline twice from an empty file and requiring the second pass to change nothing.
-
An app that ate 41 MB a second, stopped
Stopped an application filling memory at 41 MB a second — a recorded 111 GB of compressed pages on a 36 GB machine — by bounding every event stream, subscribing by event type and putting a rate budget on logging, taking 610,996 log lines down to 1,411.
-
Adopted Swift 6 strict concurrency over C
Adopted Swift 6 complete strict concurrency with no actors, bridging a blocking C event loop to the main actor through one producer, one consumer and one ordering — after establishing that a task per event loses the ordering the interface depends on.
-
Reached the unused half of the core
Reached the half of the messaging core the application had never used — backup transfer, disappearing messages, message editing and resending, verified invitations, proxies and encryption policy — driving every test against the real library with no mocks.
-
Made six collectors state what they skipped
Made six reporting collectors state the part of their input they never read — files that stayed shut, probes not installed, journal lines unrecognised — and fitted thresholds to 116 measured samples, after establishing that a blind collection and a healthy host render the same page.
If this is the work you need done, the next step is a conversation.
Tell us the problem and we will tell you honestly whether we are the right people.
This work is part of what we offer as Backend & API Development, Site Reliability & Monitoring, DevOps & CI/CD Automation, GIS & Geospatial Solutions, Platform & Solution Architecture, Technical Leadership & Consulting, Data Pipeline Development (ETL/ELT) and System Administration.
Building something that needs this? Get in touch.

